The Walls are Up and Drywall is Finished /  by Brad Palmer

The new configuration of the Fire Station is taking shape. Check out our latest walk-through tour.

Here's the Steel Plate that Will Keep Us From Falling Through the Hole /  by Brad Palmer

Check out the steel plate being cut on a CNC machine. This plate will go in one of the holes through the floor, to preserve the look of the hole location and to provide structural integrity for the floor.

Our Future Design Studio /  by Brad Palmer

In our final walk through video, you’ll see the upstairs of the fire station. This space was once the living quarters. Soon it will be our design studio.

The Apparatus Bay /  by Brad Palmer

The Apparatus Bay provides a great opportunity for expansion. It also shows off a few of the unique features of the fire station.

Are We Keeping the Poles? /  by Brad Palmer

In our second walkthrough video we take a look at the location of the old fire poles.

Come Tour Fire Station #6 /  by Brad Palmer

This is a first in a series of walk through videos of the Fire Station before renovations began.